Replacement of SPM buoy at Butinge terminal has been completed
Replacement of Single Point Mooring (SPM) buoy at Butinge terminal has been completed, and the Terminal has resumed operations. Replacement of the buoy was performed in compliance with requirements of SOFEC (designer and manufacturer of SPM). Works have been inspected and certified by American Bureau of Shipping (ABS).
Loading of the tanker “Sparto“ starts today at approximately 10 a.m.